Gresham Central Apartments

  • Property Type: Apartment Complex | Garden-Style

  • Location: Gresham, OR

  • Size: 40 Units | 3 Floors

  • Project Timeline: 2 Months | Completed in 2025

  • Service(s): Domestic Water Supply System Replacement

  • Pipe Replaced: CPVC

  • Pipe Installed: PEX

  • Building Age: Built in 1997

Project Overview

After years of recurring leaks caused by cracking and splitting CPVC supply piping, the ownership at Gresham Central Apartments decided it was time for a full domestic water supply system replacement. Repipe Specialists replaced the failing CPVC with PEX across all 40 units in just three months, keeping the project on schedule and residents comfortable throughout the process. With a hands-on approach that prioritized clear communication and respect for each resident's home, the team ensured the experience was far less disruptive than a project of this scope might suggest.

Adam Cartmill
Owner, Cartmill Construction

"Your team was great to work with and we appreciated their special attention made to each and every tenant which made this work much less intrusive than anticipated."

Additional Projects

Contact Info

Repipe Specialists Multi-Family

Complete the form to send our team your questions or comments. Or, call us at the phone number listed below.

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form

Next Steps: Sync an Email Add-On

To get the most out of your form, we suggest that you sync this form with an email add-on. To learn more about your email add-on options, visit the following page (https://www.gravityforms.com/the-8-best-email-plugins-for-wordpress-in-2020/). Important: Delete this tip before you publish the form.
Name(Required)

Repipe Specialists. Expertise every step of the way.