Hilton Garden Inn Jackson

  • Property Type: Hotel| Garden-Style

  • Location: Jackson, TN

  • Size: 98 Units | 4 Floors

  • Project Timeline: 3 Months | Completed in 2025

  • Service(s): Domestic Water Supply System Replacement

  • Pipe Replaced: PEX

  • Pipe Installed: Uponor PEX

  • Building Age: Built in 2017

Project Overview

Hilton Garden Inn in Jackson, Tennessee, began experiencing issues just years after the building was constructed. Repipe Specialists was brought in to remove the existing domestic water supply piping and install Uponor PEX across all 98 rooms. Completed in just three months, the project required careful coordination with hotel operations to minimize impact on guests and staff. Crews worked around occupancy schedules and daily hotel operations to ensure the property maintained its standard of service throughout the replacement, keeping the guest experience at the forefront from check-in to checkout.

Additional Projects

Repipe Specialists. Expertise every step of the way.

Contact Info

Repipe Specialists Multi-Family

Complete the form to send our team your questions or comments. Or, call us at the phone number listed below.

This field is for validation purposes and should be left unchanged.
This field is hidden when viewing the form

Next Steps: Sync an Email Add-On

To get the most out of your form, we suggest that you sync this form with an email add-on. To learn more about your email add-on options, visit the following page (https://www.gravityforms.com/the-8-best-email-plugins-for-wordpress-in-2020/). Important: Delete this tip before you publish the form.
Name(Required)